Name
Clients
Description A user may wish to be a member of a client that has more than one Company (or Ministry).

The Ministry Years Table contains Client ID for company links.
Name
Correspondance Type Codes
Description Correnpondance tracking classification of correspondance.

Only Budget Office/Officers should have write access to these tables. Most will not change from year to
Name
Correspondances
Description User assigned and generated correspondances/letters.

They contain comments and can point to records and images/documents.

Pointers to cost centres, and optional modificaiton item, and sub-standard codes.
Name
Cost Centres
Description Organizational Node if children exist for it, else the old equivalanet of Cost Centre. This table also stores the

budget and expenditure roll-ups/summaries for production,

- NOT for scenarios/playgrounds.



User Adding Cost Centres:



A user can add a cost centre only as non-production. The user must indicate the parent cost centre.

Budget Office/Officers must make it production for the process of integrating into the system, since

the system must then examine the organizational tree, to make adjustments to the roll-up sums.

There are activity and project selection for every cost centre added, unless the cost centre is not an

end-of-tree node. Only Bottom levels of cost centres are allowed to have budget modifications (accounting

of budget and expenditure details). All others are defined to be divisions, branches, responsibility, etc. nodes

within the organization.



The Level-nos and breakdown of budget control is done by the system utilities, activated by parent change

event.
Name
Cost Centres NON-Production
Description Organizational Node if children exist for it, else the old equivalanet of Cost Centre. This table also stores the

budget and expenditure roll-ups/summaries for production,

- NOT for scenarios/playgrounds.



User Adding Cost Centres:



A user can add a cost centre only as non-production. The user must indicate the parent cost centre.

Budget Office/Officers must make it production for the process of integrating into the system, since

the system must then examine the organizational tree, to make adjustments to the roll-up sums.

There are activity and project selection for every cost centre added, unless the cost centre is not an

end-of-tree node. Only Bottom levels of cost centres are allowed to have budget modifications (accounting

of budget and expenditure details). All others are defined to be divisions, branches, responsibility, etc. nodes

within the organization.



The Level-nos and breakdown of budget control is done by the system utilities, activated by parent change

event.
Name
Directives
Description Upper level Directive for multi-user tasks.

Ex: 10% reduction
Name
Documents
Description For Document handling, this table contains the actual file name.

The file may be a TIF image or a WP document as indicated by filename suffix.
Name
Folders
Description Server Volume Sub-directories for finding Documents.

It can refer to a real folder whose contents have been scanned into.

Thus physical folder location is documented for the originals.
Name
Function Codes
Description Function Codes attribute of Cost Centres.